1. Client wants to put the WIP job on hold whenever the related Sales Order demand is cancelled. How to achieve this?

2. What is assembly pull and operation pull?

3. Where do we define the supply subinventory/locator for backflushing?

4. Client wants to backflush all the lot controlled items based on FIFO (First in, First Out). How to meet this requirement?

5. Client wants to backflush all the lot and serial controlled items based on FIFO (First in, First Out). Is this possible using standard oracle functionality?

To provide your feedback on the above, please use the "Comments" option below this post on http://applearn.blogspot.com

Original Post on : http://applearn.blogspot.com

1 comment:

  1. 2. What is assembly pull and operation pull?.

    Operations Pull the components are back flushed at the Operations from the inventory. in assembly pull at the time of completion transaction


    3. Where do we define the supply subinventory/locator for backflushing?

    BOM and WIP parameters

    4. Client wants to backflush all the lot controlled items based on FIFO (First in, First Out). How to meet this requirement?

    Use WIP parameter from the acheive the same



    1. Client wants to put the WIP job on hold whenever the related Sales Order demand is cancelled. How to achieve this?


    Link the job Order in sales Order and set the WIP parameter respond to sales Order when linked one to One.